11LC132
                            
                                                            
                                    Tower Cranes
                                
                                                    
                                                     Flat-top tower crane
                            These tower cranes come with Comansa’s double trolley system, with automatic reeving switchover to optimise the load diagram:
When the crane needs to move its maximum load, it works with the double trolley When the maximum jib-end load is required, the crane only works with the front trolley and at the maximum speed.
                                                                        
    Technical
Specifications
                                                            
                        
                                                    2008
                                                
                                                
                                                    Year of construction
                                                
                                            
                                                    6t at 14,6m
                                                
                                                
                                                    Max. load
                                                
                                            
                                                    1,2t at 60m
                                                
                                                
                                                    Max. load at the end of the jib
                                                
                                            More products
Request a Consultation
                        2020
                        Year of construction
                    
                
                        5t at 12,5m
                        Max. load
                    
                
                        1,0t at 50m
                        Max. load at the end of the jib
                    
                
                        2008
                        Year of construction
                    
                
                        5 t at 14 m
                        Max. load
                    
                
                        1,1 t at 52,5 m
                        Max. load at the end of the jib
                    
                
                        2008
                        Year of construction
                    
                
                        18t at 14,3m
                        Max. load
                    
                
                        2,7t at 74m
                        Max. load at the end of the jib
                    
                
                        2020
                        Year of construction
                    
                
                        12t at 14m
                        Max. load
                    
                
                        2,15t at 65m
                        Max. load at the end of the jib